Constructions near I 20 SC exit 80
Roadnow AI Agent Live Update
click anywhere on map to find more Constructions
Click for Real Time Traffic
Current Constructions
- MAPRoadwork from exit [65] to Broad River Rd.
Roadwork from exit [65] to Broad River Rd.
Start Time: 2024-05-31T23:36:30.000-04:00
End Time: 2024-06-02T08:36:27.408-04:00
map local traffic - MAPWayne St is closed from Pendleton St to Gervais St.
Wayne St is closed from Pendleton St to Gervais St.
Start Time: 2024-05-31T07:29:56.000-04:00
End Time: 2024-06-07T23:59:00.000-04:00
map local traffic - MAPWayne St is closed from Gervais St to Pendleton St.
Wayne St is closed from Gervais St to Pendleton St.
Start Time: 2024-05-31T07:29:56.000-04:00
End Time: 2024-06-07T23:59:00.000-04:00
map local traffic - MAPALL LANES BLOCKED . Closed as a result of conditions identified during a recent inspection. A repair or replacement plan is being developed.
ALL LANES BLOCKED . Closed as a result of conditions identified during a recent inspection. A repair or replacement plan is being developed.
Start Time: 2024-04-10T00:00:00.000-04:00
End Time: 2024-07-10T23:59:59.000-04:00
map local traffic - MAPTEMPORARY LANE CLOSURES . Lane closures due to resurfacing of roadway.
TEMPORARY LANE CLOSURES . Lane closures due to resurfacing of roadway.
Start Time: 2024-03-01T00:00:00.000-05:00
End Time: 2024-06-30T23:59:59.000-04:00
map local traffic