Constructions near I 20 TX exit 418
Roadnow AI Agent Live Update
click anywhere on map to find more Constructions
Click for Real Time Traffic
Current Constructions
- MAPRoadwork on Sycamore School Rd from Chisholm Trail Pkwy to Columbus Trl.
Roadwork on Sycamore School Rd from Chisholm Trail Pkwy to Columbus Trl.
Start Time: 2024-06-12T03:08:00.000-05:00
End Time: 2024-06-12T07:14:14.848-05:00
map local traffic - MAPRoadwork on Summer Creek Dr from W Risinger Rd (N Summer Creek Dr) to Columbus Trl (N Summer Creek Dr).
Roadwork on Summer Creek Dr from W Risinger Rd (N Summer Creek Dr) to Columbus Trl (N Summer Creek Dr).
Start Time: 2024-06-11T23:08:00.000-05:00
End Time: 2024-06-12T07:14:14.848-05:00
map local traffic - MAPSouth Dr is closed from W Seminary Dr to Granbury Rd.
South Dr is closed from W Seminary Dr to Granbury Rd.
Start Time: 2024-06-11T12:06:53.000-05:00
End Time: 2024-06-13T23:59:00.000-05:00
map local traffic - MAPE 15th St is closed from E Lancaster Ave / Jones St to Commerce St.
E 15th St is closed from E Lancaster Ave / Jones St to Commerce St.
Start Time: 2024-06-11T07:10:45.000-05:00
End Time: 2024-06-17T23:59:00.000-05:00
map local traffic - MAPE 15th St is closed from Commerce St to Jones St.
E 15th St is closed from Commerce St to Jones St.
Start Time: 2024-06-11T07:10:45.000-05:00
End Time: 2024-06-17T23:59:00.000-05:00
map local traffic - MAPBryan Ave is closed from E Peter Smith St to E Tucker St.
Bryan Ave is closed from E Peter Smith St to E Tucker St.
Start Time: 2024-06-11T07:06:47.000-05:00
End Time: 2024-06-14T23:59:00.000-05:00
map local traffic - MAPLanes closed to traffic, detour in place. Nighttime closure only. Watch for flag personnel directing traffic. SH 183 (NE 28th St) EB/WB from N Nichols St to Decatur Ave. Full implementation of Detour Plan, signed and sealed on sheet 22 as engineering safety control and protection of traffic during the Phase 1 Step 4 drainage system A 5x2 RCB installation traffic shift into Phase 2 and the removal of the LPCB. Detour will be implemented during night work at 9Pm & will be returned into current traffic pattern.
Lanes closed to traffic, detour in place. Nighttime closure only. Watch for flag personnel directing traffic. SH 183 (NE 28th St) EB/WB from N Nichols St to Decatur Ave. Full implementation of Detour Plan, signed and sealed on sheet 22 as engineering safety control and protection of traffic during the Phase 1 Step 4 drainage system A 5x2 RCB installation traffic shift into Phase 2 and the removal of the LPCB. Detour will be implemented during night work at 9Pm & will be returned into current traffic pattern.
Start Time: 2024-06-10T10:00:00.000-05:00
End Time: 2024-06-13T22:00:00.000-05:00
map local traffic - MAPRoadwork on S Main St from Feliks Gwozdz Pl to E Morphy St.
Roadwork on S Main St from Feliks Gwozdz Pl to E Morphy St.
Start Time: 2024-06-11T17:06:03.000-05:00
End Time: 2024-06-12T07:14:14.848-05:00
map local traffic - MAPDelays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd NB/SB from 287 to Watauga Smithfield Rd: traffic control to install permanent marking, block sodding, ramps, sidewalk, & work on punch list items.
Delays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd NB/SB from 287 to Watauga Smithfield Rd: traffic control to install permanent marking, block sodding, ramps, sidewalk, & work on punch list items.
Start Time: 2024-06-10T14:00:00.000-05:00
End Time: 2024-06-15T20:00:00.000-05:00
map local traffic - MAPDelays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd NB/SB from 287 to Watauga Smithfield Rd: traffic control to install permanent marking, block sodding, ramps, sidewalk, & work on punch list items.
Delays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd NB/SB from 287 to Watauga Smithfield Rd: traffic control to install permanent marking, block sodding, ramps, sidewalk, & work on punch list items.
Start Time: 2024-06-10T14:00:00.000-05:00
End Time: 2024-06-15T20:00:00.000-05:00
map local traffic - MAPLanes closed to traffic, detour in place. Nighttime closure only. Watch for flag personnel directing traffic. SH 183 (NE 28th St) EB/WB from N Nichols St to Decatur Ave. Full implementation of Detour Plan, signed and sealed on sheet 22 as engineering safety control and protection of traffic during the Phase 1 Step 4 drainage system A 5x2 RCB installation traffic shift into Phase 2 and the removal of the LPCB. Detour will be implemented during night work at 9Pm & will be returned into current traffic pattern.
Lanes closed to traffic, detour in place. Nighttime closure only. Watch for flag personnel directing traffic. SH 183 (NE 28th St) EB/WB from N Nichols St to Decatur Ave. Full implementation of Detour Plan, signed and sealed on sheet 22 as engineering safety control and protection of traffic during the Phase 1 Step 4 drainage system A 5x2 RCB installation traffic shift into Phase 2 and the removal of the LPCB. Detour will be implemented during night work at 9Pm & will be returned into current traffic pattern.
Start Time: 2024-06-10T10:00:00.000-05:00
End Time: 2024-06-13T22:00:00.000-05:00
map local traffic - MAPRoadwork on Lieutenant Jg Barnett Rd from River Hill Ln to Carswell Access Rd.
Roadwork on Lieutenant Jg Barnett Rd from River Hill Ln to Carswell Access Rd.
Start Time: 2024-06-10T08:02:30.000-05:00
End Time: 2024-06-12T07:14:14.848-05:00
map local traffic - MAPRoadwork on E Long Ave from Deen Rd (Long Ave) to US-287 Bus/N Main St (Long Ave).
Roadwork on E Long Ave from Deen Rd (Long Ave) to US-287 Bus/N Main St (Long Ave).
Start Time: 2024-06-07T08:35:30.000-05:00
End Time: 2024-12-31T00:00:00.000-06:00
map local traffic - MAPRoadwork on E Long Ave from US-287 Bus/N Main St (Long Ave) to Deen Rd (Long Ave).
Roadwork on E Long Ave from US-287 Bus/N Main St (Long Ave) to Deen Rd (Long Ave).
Start Time: 2024-06-07T08:34:00.000-05:00
End Time: 2024-12-31T00:00:00.000-06:00
map local traffic - MAPDelays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd NB/SB from 287 to Watauga Smithfield Rd: traffic control to install permanent marking, block sodding, ramps, sidewalk, & work on punch list items.
Delays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd NB/SB from 287 to Watauga Smithfield Rd: traffic control to install permanent marking, block sodding, ramps, sidewalk, & work on punch list items.
Start Time: 2024-05-22T07:36:45.000-05:00
End Time: 2024-07-10T23:55:00.000-05:00
map local traffic